Category:Powder Coating Facility: Difference between revisions

From Artisans Asylum Wiki
No edit summary
No edit summary
Line 27: Line 27:


=Description=
=Description=
{| class="infobox" cellspacing="0" style="width: 2em; text-align: left; font-size: 125%; line-height: 1.5em;"
! colspan="2" class="infobox-image" | [[File:goggle_mask.png|100px| ]]
|-
| colspan="2" | 
|-
|}


Located in a room on the southern wall of the Metal Shop, between the sand-blasting room and the CNC plasma cutter.  This facility is sized to accommodate bicycle frames.  A rolling rack holds the workpieces in an 8'x8'x8' spray booth and then transfers to a 4'x4'x8' box oven.  Two guns are available, and many jars of colored paints are present in the shop.  The spray booth is vented inside the room after filtering the airflow.
Located in a room on the southern wall of the Metal Shop, between the sand-blasting room and the CNC plasma cutter.  This facility is sized to accommodate bicycle frames.  A rolling rack holds the workpieces in an 8'x8'x8' spray booth and then transfers to a 4'x4'x8' box oven.  Two guns are available, and many jars of colored paints are present in the shop.  The spray booth is vented inside the room after filtering the airflow.
Line 35: Line 42:


=Use For=
=Use For=
{| class="infobox" cellspacing="0" style="width: 2em; text-align: left; font-size: 125%; line-height: 1.5em;"
! colspan="2" class="infobox-image" | [[File:goggle_mask.png|100px| ]]
|-
| colspan="2" | 
|-
|}


Clean metal parts.
Clean metal parts.

Revision as of 10:31, 20 May 2024


Link to: Metal Shop main page



Powder Coating
Painting steel parts
General Info
Make
Model
Serial Unknown
Specs
Manual link= Manual for a similar model
Asylum Info
Location Metal Shop
Rubric
Training Tool classes
Testing Tool testing, or [[:Category:Metal Shop#Tool Testing

Night|come to the shop on Tool Testing Night]]

Restrictions green


Description

Goggle mask.png

Located in a room on the southern wall of the Metal Shop, between the sand-blasting room and the CNC plasma cutter. This facility is sized to accommodate bicycle frames. A rolling rack holds the workpieces in an 8'x8'x8' spray booth and then transfers to a 4'x4'x8' box oven. Two guns are available, and many jars of colored paints are present in the shop. The spray booth is vented inside the room after filtering the airflow.

The process uses dry powdered paint that is applied with a pneumatic gun that includes a high-voltage electrode. As the powder passes by the electrode it becomes electrically charged. The metallic workpiece is grounded and so it attracts the charged paint particles. After coating, workpieces are baked in a convection oven to fuse the paint.

Films made by powder coating are up to ten times more durable than those made with liquid paint. The coatings are essentially fused plastic, and so they resist chemicals and salt exceptionally well. Further, the process produces no organic fumes or toxic waste.

Use For

Clean metal parts.

Weldments

Brazed parts

Forgings

Castings

Sheet metal

Steel, Stainless, Galvanized, Aluminum, Titanium, etc.

Do Not Use For

Dirty, rusty, or flaky metal parts.

Nonconductive plastic, wooden, or ceramic parts.

Parts that can't tolerate heating to 400°F (200°C)

Safety Notes

High voltage warning.png

Pages in category "Powder Coating Facility"

The following 4 pages are in this category, out of 4 total.